Vertigo
A skyscraper under construction. Both sites sit on the same floor, with ramps, scaffolding and a long drop off the edge.
Pool status
Out of the Active Duty pool since 28 Jan 2025.
Vertigo callouts
9 callouts across T side, A site, Mid, B site, CT side. See every Vertigo callout.